Planning and Construction for Developers in Romania: PUG, PUZ, the Urbanism Certificate (Certificat de Urbanism) and What to Check Before Buying Land for Development

A developer's guide to Romanian planning: PUG, PUZ and PUD, what an urbanism certificate gives, the new 2026 Urbanism Code and what to check before buying land.

By Adv. Ilan LeibovitchUpdated: 9 min read
DevelopmentPl. I

In brief

What may be built on land in Romania is determined at three planning levels: a general urban plan for the locality (PUG), a zonal plan (PUZ) and a detailed plan (PUD). An urbanism certificate (certificat de urbanism) summarizes the planning regime of a particular plot, but it is an information document only and does not confer a right to build. From 25 August 2026, the new Urbanism Code (Law 169/2026) applies, which changed the rules for dividing land into plots, the approval procedures and the time limits. Before buying land for development, you must check the plan that actually applies, legal proceedings against it, the building coefficients and access to infrastructure, and make the purchase conditional on planning.

Key takeaways

  1. 1The new Urbanism Code (Law 169/2026) entered into force on 25 August 2026. Applications filed up to 24 August are examined under the previous laws.
  2. 2An urbanism certificate is an information document only. It does not replace a building permit, and under the previous law it is valid for 6 to 24 months.
  3. 3Under the new code, division into 3 to 12 plots for private houses requires a PUD, and division into more than 12 plots or for other uses requires a PUZ.
  4. 4In Bucharest, the PUZ plans of the sectors were suspended in 2021 and some were annulled in court. From 1 November 2028, building permits in the city will be issued by the General City Hall.
  5. 5The most important rule: do not pay the full price for land whose building rights still depend on a future plan.

What changed in planning law in Romania in 2026?

On 25 August 2026, the Code of Territorial Planning, Urbanism and Construction (Codul Amenajării Teritoriului, Urbanismului și Construcțiilor), approved as Law 169/2026, entered into force. The President signed it on 5 August 2026, and it was published in the Official Gazette on 10 August. The code unifies planning and construction law, which until then was scattered mainly across Law 350/2001 on planning and Law 50/1991 on building permits.

The transitional provisions are important for anyone who is already in the middle of a process:

  • Applications for an urbanism certificate, for approvals or for permits filed up to 24 August 2026 are examined under the previous law. Applications filed from 25 August are examined under the new code, even if the certificate or approval was issued before that.
  • Urbanism certificates issued before the code entered into force remain valid for the period specified in them.
  • Building permits issued under the previous law can be extended once, for up to 12 months. The application is filed at least 15 working days before the permit expires.
  • The new definition of the land coverage coefficient (POT) does not apply to plans approved before 25 August 2026.

In a separate article we deal with the procedure for obtaining the building permit itself. Here we focus on what comes before it: how to understand what may be built on land before buying it.

An urbanism certificate is an information document only. It does not replace a building permit, and under the previous law it is valid for 6 to 24 months.

Key takeaways

What is the difference between PUG, PUZ and PUD?

These are the three levels of urban planning in Romania, from the most general to the most detailed. The plan that applies to the plot determines the permitted use, the height and the building coefficients.

PlanWhat it determinesWhen it is required
PUG - Plan Urbanistic GeneralA master plan for the whole locality: the boundary of the built-up area (intravilan), zoning designations, local building regulationsExists for every locality. It is the basis for every permit
PUZ - Plan Urbanistic ZonalA plan for an area: it can change designation, height, building coefficients and building lines, and can also include land in the built-up areaWhen you want to deviate from the PUG, extend the built-up area or divide into more than 12 plots
PUD - Plan Urbanistic de DetaliuA detailed plan for a plot or several plots: the position of the building, setbacks, accessTo detail the rules, and under the new code also for division into 3 to 12 plots for private houses

Under the new code, dividing a plot into two plots is a simple cadastral operation (dezlipire). Division into 3 to 12 plots for private houses requires a PUD. Division into more than 12 plots, or for other uses, requires a PUZ. For a developer planning a neighborhood of landed houses, this rule changes the timetable and the budget.

Bucharest

What is an urbanism certificate, and what is it not?

An urbanism certificate (certificat de urbanism) is an information document issued by the local authority. It describes the legal, economic and technical regime of the plot, the planning requirements that apply to it and the list of approvals needed for the permit. It does not confer a right to build and does not replace a building permit. Under the previous law it is valid for between 6 and 24 months, depending on the purpose of the application and the complexity of the project, and it can be extended by up to 12 months if requested at least 15 days before it expires.

Before a purchase, the certificate is the cheapest and fastest tool for checking what may be built. The norms under the previous law did not require the applicant to prove ownership of the plot. Therefore, a certificate can usually be requested for information purposes even before buying, although the authority may request additional documents. In the certificate, three things are mainly checked:

  • The plan that applies to the plot: the PUG alone, or also an approved PUZ or PUD.
  • The parameters: permitted use, maximum height, land coverage (POT), utilization coefficient (CUT) and setbacks.
  • The additional requirements: whether the authority requires, before the permit, a PUZ or PUD, studies or special approvals, for example in conservation areas or areas with building restrictions.

Under the new code, an urbanism certificate is also required for merging and dividing plots within the built-up area. Outside the built-up area it is not required when the operation is not intended for construction, provided that this is declared.

What are POT and CUT, and why do they determine the value of the land?

POT (procent de ocupare a terenului) is the percentage of the plot area covered by construction. CUT (coeficient de utilizare a terenului) is the ratio between the total built area and the plot area. For a developer, CUT is in effect the number of apartments or offices that can be sold, and it therefore determines how much the land is worth. The definition of POT was updated in the new code, so in a plan approved after 25 August 2026 you need to check under which definition the coefficients were calculated.

Price by approved CUT, not by hoped-for CUT

Sellers often present land according to rights that a PUZ plan is “about to approve”. Until the PUZ is approved and can no longer be challenged, these rights are an expectation and not an asset. The gap between the existing situation and the hoped-for situation is bridged in the structure of the deal, as we detail below, and not in the price.

How is a PUZ approved, and what changed in the new code?

A PUZ is the tool for changing what may be built: extending the built-up area, changing designation, increasing height and coefficients. The procedure includes an opening stage, in which an initiation approval (aviz de inițiere) must be obtained, followed by the preparation of the plan by an authorized planner, obtaining approvals from various bodies, public consultation and approval by the local council. In practice, the procedure takes many months, and sometimes longer.

The new code introduced several changes that are important for developers:

  • Integrated approvals committee (comisia de avizare integrată): consolidation of the approvals in a single body. The committee is supposed to be set up within 45 working days of the publication of the law.
  • Tacit approval: if an approving body not represented on the committee did not request clarifications and did not decide within the time limit set by law, the documents are considered complete, and the applicant continues with proof of filing and a declaration that no answer was received. The exceptions: defense and public order bodies, the initiation approval and the chief architect's approval, which cannot be given tacitly.
  • Partial nullity: under Article 146(1) of the code, where the illegality concerns only part of a plan such as a PUZ, the court may declare partial nullity, and the rest is not automatically affected. This reduces the risk, but does not eliminate it, because the court examines each defect on its merits.

What is special about planning in Bucharest?

In Bucharest the situation is particularly complex, and it is worth checking each plot on its merits. In February 2021, the General City Council suspended the coordinating PUZ plans of sectors 2 to 6. Subsequently, the court of appeal finally annulled the plans of sectors 3 and 6, and the district court suspended the plans of sectors 2, 4 and 5. As a result, in large parts of the city permits were issued on the basis of the old PUG, approved in 2000.

Under the new code, from 1 November 2028 some of the powers to issue building permits will pass from the sector mayors to the Mayor of the General City Hall, and the implementing regulations must be completed by 1 July 2027. In a project in which the permit is expected to be issued around that date, it is worth planning in advance who the competent authority will be. The provisions state that the new authority will issue the permit on the basis of an urbanism certificate that is still valid.

What do you check before buying land for development in Romania?

  1. Land book and cadastre: ownership, registered area versus actual area, security interests and legal proceedings.
  2. Classification: whether the land is intravilan or extravilan, and what the registered type of use is. Agricultural land requires a procedure to remove it from agricultural designation.
  3. An urbanism certificate for information purposes: before signing a binding agreement.
  4. The plan that actually applies: whether the PUZ or PUD that the seller relies on were approved, published, and whether there is a petition or suspension against them.
  5. Coefficients and restrictions: POT, CUT, height, setbacks, conservation areas, aviation restrictions, power lines, roads and railways.
  6. Access and infrastructure: a legal access road, water, sewage, electricity and gas. Under the new code, connections that pass through public land require the road manager's consent, without a building permit.
  7. Environment and soil: contamination, flooding, existing structures that must be demolished.
  8. Who may purchase: if the buyer is a citizen of a country outside the Union, purchasing through a Romanian company.
RiskHow to checkHow to protect in the contract
The PUZ will not be approved or will be approved with lower rightsChecking the stage of the procedure with the authorityA preliminary agreement or option, with a condition precedent that the PUZ is approved
A petition against an approved planChecking files in the administrative courts and council resolutionsThe main part of the consideration is paid only after the plan can no longer be appealed
No access road or infrastructureChecking the cadastre and approaching the infrastructure providersThe seller undertakes to arrange an easement
A gap between the registered area and the actual areaA survey by a licensed surveyorAdjusting the price per square meter
Agricultural classificationExtract and urbanism certificateThe costs and responsibility for removal from agricultural designation are defined in the contract

How do you structure a land deal that depends on planning?

When the value of the land depends on a plan that has not yet been approved, you pay for the rights only when they are obtained. There are several customary structures: a notarial preliminary agreement with a condition precedent, such as approval of a PUZ or obtaining a building permit, after which the sale contract is signed; an option for a low payment for the planning period; a graduated price, in which part of the consideration depends on the CUT actually approved; and a combination deal with the landowner, in return for areas in the project. In all these structures it is determined in advance who files the applications, who pays the planners, and what happens if the plan is rejected.

Before you sign: how we accompany a land purchase for development

We work as developers and as lawyers, and therefore we check land as a developer checks it: first the plan and what can actually be built, and only then the price. We request an urbanism certificate, examine the legal status of the plans, and coordinate with local planners and surveyors. We build the purchase transaction so that payment is tied to planning progress. Since the new code entered into force, we also check for each project which law applies to it during the transitional period.

General information

This article is general information, as of October 2026, and is not legal advice for a specific case. The new Urbanism Code entered into force only in August 2026, and its interpretation in practice and the implementing regulations are still taking shape. Before buying land, obtain advice tailored to your case.

Frequently asked questions

What is a PUZ in Romania?

A PUZ (Plan Urbanistic Zonal) is a plan for a particular area, which can change what is set in the general master plan (PUG): the land designation, the building height, the building coefficients and the building lines. It can also include land in the built-up area. Under the new Urbanism Code, a PUZ is also required for division into more than 12 plots.

Does an urbanism certificate permit building?

No. An urbanism certificate is an information document that describes the planning regime of the plot and the approvals required. It does not replace a building permit and does not confer a right to build. Under the previous law it is valid for 6 to 24 months, and it can be extended by up to 12 months.

When did the new Urbanism Code enter into force in Romania?

The Code of Territorial Planning, Urbanism and Construction (Law 169/2026) entered into force on 25 August 2026. Applications filed up to 24 August 2026 are examined under the previous law, and urbanism certificates issued before that remain valid for the period specified in them.

How long does it take to obtain a building permit in Romania under the new code?

Under the new code, the general time limit for issuing a building permit is 30 calendar days from filing a complete application. At the applicant's request, a permit can be obtained in an expedited procedure within at most 7 working days, and the authority may charge a special fee for this. The planning that precedes the permit, such as a PUZ, usually takes much longer.

Is it worth buying land based on the rights of a PUZ that has not yet been approved?

Only in a structure that protects you. The rights of an unapproved PUZ are an expectation only. It is usually preferable to have a preliminary agreement with a condition precedent of approval of the plan, an option or a graduated price according to the CUT that will be approved, and not full payment in advance.

Read next · 7 min readA Will for an Israeli With Property in Romania: Choice of Law, Form of the Will and Coordination With the Will in IsraelHow to write a will that works for property in Romania: Regulation 650/2012 and choice of law, notarial or handwritten wills, reserved shares, the Israeli will.Read the guide

Sources

  1. Actual de Cluj - Codul urbanismului explicat: ce se întâmplă cu actele și autorizațiile depuse înainte de 25 august
  2. Actual de Cluj - Noul Cod al Urbanismului, explicat primarilor din Cluj
  3. Wall-Street.ro - Noul Cod al Urbanismului a fost promulgat: 3 schimbări care pot încuraja investițiile imobiliare
  4. HotNews - Documentațiile PUZ și PUD în Codul amenajării teritoriului, urbanismului și construcțiilor (proiect, ianuarie 2024)
  5. Avocatnet - Obținerea certificatului de urbanism
  6. e-juridic (Rentrop & Straton) - PUZ-urile sectoarelor 2, 4 și 5 au fost suspendate

The information in this guide is general in nature and does not constitute legal or tax advice on any specific transaction. Every transaction is assessed on its own facts.

Let’s start with a conversation.

A sound international transaction begins long before signing. A short introductory call will clarify whether, and how, we are the right firm to support you.